Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Jun 20, 2007     Flap switch console prototyping - (.5 hour)       Category: Fuselage
I fiddled with cardboard and scissors again this evening. I ended up prototyping and fitting a small angled console just forward of the throttle quadrant. This console would allow me to mount the throttle quadrant in the stock location, but still allow the flap switch to be in an easily-accessible place (which is one of the main things I wanted to accomplish in the first place with an angled side console).

Next, I'll transfer the design to thin posterboard for final testing, then to 0.032 or 0.040 aluminum.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.